{"id":2372,"date":"2025-09-03T14:39:23","date_gmt":"2025-09-03T06:39:23","guid":{"rendered":"https:\/\/daqotransformers.com\/?p=2372"},"modified":"2025-11-19T11:15:26","modified_gmt":"2025-11-19T03:15:26","slug":"ethiopia-grand-ethiopian-renaissance-dam-gerd-hydropower-project","status":"publish","type":"post","link":"https:\/\/daqotransformers.com\/es\/ethiopia-grand-ethiopian-renaissance-dam-gerd-hydropower-project\/","title":{"rendered":"Etiop\u00eda - Proyecto hidroel\u00e9ctrico de la presa del Gran Renacimiento Et\u00edope (GERD)"},"content":{"rendered":"<p>La Gran Presa del Renacimiento Et\u00edope (GERD) es la central hidroel\u00e9ctrica m\u00e1s grande de \u00c1frica, con una capacidad instalada de 5,15 GW y una producci\u00f3n anual de 15.700 GWh. Representa un hito para paliar la escasez de electricidad en \u00c1frica Oriental y acelerar el desarrollo econ\u00f3mico.<\/p>\n<p>Daqo Transformer suministr\u00f3 116 transformadores de tipo seco a Voith Hydro (Alemania), la empresa contratista de ingenier\u00eda, adquisici\u00f3n y construcci\u00f3n (EPC) del proyecto, en virtud de un contrato de 2,23 millones de d\u00f3lares. Estos transformadores desempe\u00f1an funciones cr\u00edticas en la transmisi\u00f3n y distribuci\u00f3n de energ\u00eda dentro de la presa, lo que demuestra las avanzadas capacidades de China en infraestructura hidroel\u00e9ctrica a nivel mundial.<\/p>\n<h2>Modelos y cantidades suministrados (lista parcial):<\/h2>\n<p>SCB10-1250~4000\/15\/0.415<\/p>\n<p>SC10-4000~6300\/18\/15<\/p>\n<p>SCZB10-315~500\/15\/0.415<\/p>\n<p>Total: m\u00e1s de 110 unidades<\/p>","protected":false},"excerpt":{"rendered":"<p>GERD is Africa\u2019s largest hydropower station with 5.15 GW installed capacity, producing 15,700 GWh annually. It is a milestone in addressing electricity shortages across East Africa and accelerating economic development. Daqo Transformer supplied 116 dry-type transformers to Voith Hydro (Germany), the project\u2019s EPC contractor, under a USD 2.23 million contract. These transformers serve critical functions [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2977,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[12],"tags":[],"class_list":["post-2372","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-company-news"],"_links":{"self":[{"href":"https:\/\/daqotransformers.com\/es\/wp-json\/wp\/v2\/posts\/2372","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/daqotransformers.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/daqotransformers.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/daqotransformers.com\/es\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/daqotransformers.com\/es\/wp-json\/wp\/v2\/comments?post=2372"}],"version-history":[{"count":5,"href":"https:\/\/daqotransformers.com\/es\/wp-json\/wp\/v2\/posts\/2372\/revisions"}],"predecessor-version":[{"id":4801,"href":"https:\/\/daqotransformers.com\/es\/wp-json\/wp\/v2\/posts\/2372\/revisions\/4801"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/daqotransformers.com\/es\/wp-json\/wp\/v2\/media\/2977"}],"wp:attachment":[{"href":"https:\/\/daqotransformers.com\/es\/wp-json\/wp\/v2\/media?parent=2372"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/daqotransformers.com\/es\/wp-json\/wp\/v2\/categories?post=2372"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/daqotransformers.com\/es\/wp-json\/wp\/v2\/tags?post=2372"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}