{"id":2372,"date":"2025-09-03T14:39:23","date_gmt":"2025-09-03T06:39:23","guid":{"rendered":"https:\/\/daqotransformers.com\/?p=2372"},"modified":"2025-11-19T11:15:26","modified_gmt":"2025-11-19T03:15:26","slug":"ethiopia-grand-ethiopian-renaissance-dam-gerd-hydropower-project","status":"publish","type":"post","link":"https:\/\/daqotransformers.com\/fr\/ethiopia-grand-ethiopian-renaissance-dam-gerd-hydropower-project\/","title":{"rendered":"\u00c9thiopie \u2013 Projet hydro\u00e9lectrique du Grand barrage de la Renaissance \u00e9thiopienne (GERD)"},"content":{"rendered":"<p>Le barrage de Gerd-Einstein (GERD) est la plus grande centrale hydro\u00e9lectrique d&#039;Afrique, avec une capacit\u00e9 install\u00e9e de 5,15 GW et une production annuelle de 15\u00a0700 GWh. Il repr\u00e9sente une \u00e9tape majeure dans la r\u00e9solution des p\u00e9nuries d&#039;\u00e9lectricit\u00e9 en Afrique de l&#039;Est et contribue \u00e0 acc\u00e9l\u00e9rer le d\u00e9veloppement \u00e9conomique.<\/p>\n<p>Daqo Transformer a fourni 116 transformateurs secs \u00e0 Voith Hydro (Allemagne), l&#039;entreprise charg\u00e9e de l&#039;ing\u00e9nierie, de l&#039;approvisionnement et de la construction du projet, dans le cadre d&#039;un contrat de 2,23 millions de dollars. Ces transformateurs jouent un r\u00f4le essentiel dans le transport et la distribution d&#039;\u00e9lectricit\u00e9 au sein du barrage, illustrant ainsi le savoir-faire avanc\u00e9 de la Chine en mati\u00e8re d&#039;infrastructures hydro\u00e9lectriques \u00e0 l&#039;\u00e9chelle mondiale.<\/p>\n<h2>Mod\u00e8les et quantit\u00e9s fournis (liste partielle)\u00a0:<\/h2>\n<p>SCB10-1250~4000\/15\/0,415<\/p>\n<p>SC10-4000~6300\/18\/15<\/p>\n<p>SCZB10-315~500\/15\/0,415<\/p>\n<p>Total : plus de 110 unit\u00e9s<\/p>","protected":false},"excerpt":{"rendered":"<p>GERD is Africa\u2019s largest hydropower station with 5.15 GW installed capacity, producing 15,700 GWh annually. It is a milestone in addressing electricity shortages across East Africa and accelerating economic development. Daqo Transformer supplied 116 dry-type transformers to Voith Hydro (Germany), the project\u2019s EPC contractor, under a USD 2.23 million contract. These transformers serve critical functions [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2977,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[12],"tags":[],"class_list":["post-2372","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-company-news"],"_links":{"self":[{"href":"https:\/\/daqotransformers.com\/fr\/wp-json\/wp\/v2\/posts\/2372","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/daqotransformers.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/daqotransformers.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/daqotransformers.com\/fr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/daqotransformers.com\/fr\/wp-json\/wp\/v2\/comments?post=2372"}],"version-history":[{"count":5,"href":"https:\/\/daqotransformers.com\/fr\/wp-json\/wp\/v2\/posts\/2372\/revisions"}],"predecessor-version":[{"id":4801,"href":"https:\/\/daqotransformers.com\/fr\/wp-json\/wp\/v2\/posts\/2372\/revisions\/4801"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/daqotransformers.com\/fr\/wp-json\/wp\/v2\/media\/2977"}],"wp:attachment":[{"href":"https:\/\/daqotransformers.com\/fr\/wp-json\/wp\/v2\/media?parent=2372"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/daqotransformers.com\/fr\/wp-json\/wp\/v2\/categories?post=2372"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/daqotransformers.com\/fr\/wp-json\/wp\/v2\/tags?post=2372"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}