On October 28, the Jurong Pumped Storage Power Station in Jiangsu, developed by State Grid Xinyuan Company, was officially put into full operation. As the world’s tallest dam-based pumped storage power station, this mega project features:
Total installed capacity: 1.35 million kW
Upper dam height: 182.3 meters (equivalent to a 60-story building)
Reservoir capacity: 17.07 million m³ (1.2× China’s West Lake)
Annual generation: 1.35 billion kWh
A “Green Energy Power Bank” for the Yangtze River Delta
The station serves as a crucial clean energy regulator, providing peak shaving, load balancing, and enhanced energy security for the regional grid. Its successful commissioning marks a significant boost to the Yangtze River Delta’s green development.
Daqo Group’s Core Role in the Project
As a key equipment supplier, Daqo Group provided its independently developed high-voltage enclosed busbar systems, ensuring stable, safe, and efficient power transmission for this world-class energy facility.

Strong Technical Backbone
In the renewable energy sector, Daqo has supplied:
Enclosed busbars
Switchgear
Transformers
Prefabricated substations
Medium- and low-voltage distribution systems

Extensive Global Project Experience
Daqo equipment has been deployed in:
2,000+ wind and photovoltaic energy projects worldwide
This long-term experience has enabled the company to build solid engineering and technical strength in new energy power systems.

Commitment to Green and Low-Carbon Development
Daqo Group continues to align with national energy strategies, promoting the clean energy transition through innovation and high-performance products.
Building the “Green Arteries” of Clean Energy